How long will flooring installation take?
Timing depends on the rooms, product, preparation, access and accepted scope. The proposed schedule is confirmed after those details are reviewed.
Flooring installation and renovation enquiries begin with the real site, preparation, finish, access, and schedule.
Site-led assessment
Scope before quote
Separate flooring purchase
Our services
Start with the service that fits the project.
Renovations
Kitchen, bathroom, laundry and whole-home renovations, planned around your property.
Flooring
Browse and purchase flooring online through sister brand Select XPO Floors. Frank quotes services separately.
Supply and installation in one price, with removal of your old carpet included.
$60
Per m² plus GST.
$55
Per m² plus GST.
$48
Per m² plus GST.
The real site and request
Before the service quote
Flooring through Select XPO
Project enquiry with Frank
See what each service includes, how a project runs, and answers to common questions.

Installation planning and delivery for timber, hybrid, laminate, vinyl and carpet floors, with preparation and finishing defined in the accepted scope.
View service →
Assessment, sanding and finishing options for existing timber floors, subject to board condition and a site review.
View service →
A project conversation to review rooms, product priorities, measurements, site conditions and the information needed for a written scope.
View service →
Wall, kitchen, bathroom, tile and carpet removal, then floor grinding and levelling, so your renovation or new floor starts on a clean, flat base.
View service →Tell us about the rooms and the result you want. We look at the property, timing and trades involved, then confirm what we can take on and the next steps.
Plan a kitchen renovation around the existing room, practical storage, surfaces, services, finishes and the sequence of agreed trade work.
Scope a bathroom renovation around the existing room, water management, fixtures, storage, ventilation, surfaces and agreed trade requirements.
Plan a more practical laundry around appliance positions, storage, work surfaces, plumbing, ventilation, flooring and adjoining spaces.
Coordinate an interior update across connected rooms, with an agreed scope for finishes, flooring, joinery, painting and required trade work.
Develop a coordinated whole-home scope that connects priorities, room dependencies, selections, trade sequencing, access and staged delivery.

Discuss the product type, room layout, existing floor, substrate, access and finish details. The written quote confirms preparation, installation method, trims, cleanup and exclusions.
Frank Home Group provides professional installation and renovation services. Browse and purchase flooring online through our sister brand, Select XPO Floors.
Select XPO supplies and sells the flooring through its own online store.
Frank Home Group assesses and quotes installation or renovation services separately.
The product purchase and the service request remain clearly separated for the customer.
All of our renovations are carried out with Rio Homes, a registered Victorian domestic builder. One team plans the work, organises the trades and builds it under a builder's registration.
Rio Homes
Tell us about your block and what you want to build, and we'll talk you through the next steps.
Talk about a new homeShare the flooring type, rooms, existing floor, property access and intended timing.
Review measurements, substrate condition, preparation, layout, trims and other project requirements.
Confirm included preparation, installation work, exclusions, responsibilities, timing and price.
Complete the accepted scope and review agreed finishing details and care information at handover.
Flooring installation and renovation enquiries begin with the real site, preparation, finish, access, and schedule.
Share the property type, intended work, timing, and contact details. Frank Home Group can then respond to the real enquiry without treating an online flooring order as an installation contract.
Discuss a projectAnswers from the published Frank Home Group service scopes shown above.
Timing depends on the rooms, product, preparation, access and accepted scope. The proposed schedule is confirmed after those details are reviewed.
Removal and disposal can be discussed and are included only when they appear in the accepted written scope.
Send the property address with the enquiry. Frank Home Group will confirm availability and whether the location is in scope before quoting.
Board type, thickness, previous sanding, damage and coating condition must be assessed before suitability can be confirmed.
Tell Frank Home Group about the property and intended work so the team can confirm the next step.